Major Project Requirements, Information Management Standards and Final Submission Guidelines

This class session focused on the requirements and expectations for Assignment 2, the major collaborative BIM project for Advanced Computing 1. The discussion covered final submission requirements, international information management standards, model quality, documentation workflows, and the importance of distinguishing between verified survey information and assumptions when developing digital building models.

Students were also introduced to Assignment 3, which will focus on applying graphical techniques explored in the Mimic exercise to their architectural studio presentation work.


1. Autodesk Forma Access and Collaboration Updates

The session began with a review of outstanding technical issues relating to Autodesk Forma and cloud collaboration. Some students were still experiencing difficulties accessing the shared Forma environment due to account and licensing issues.

Arrangements were discussed to resolve access for the affected students, including resending the class access link and assigning the necessary Autodesk licences.

Students experiencing difficulties with cloud sharing were encouraged to discuss these issues individually so that they could be resolved before the final submission.


2. Assignment 2 – Major Project: Final Submission Requirements

The main focus of the session was the final submission for Assignment 2. Students were reminded that the project is not simply about producing a completed Revit model; it is about demonstrating an organised, coordinated and properly documented BIM workflow.

The final submission must consist of two primary components:

  • The Revit Model: The completed collaborative BIM model, properly organised and structured, with identifiable views, drawings, schedules and associated information.

  • The Consolidated PDF Document: A single, aggregated PDF containing all project drawings, schedules, photographs and supporting documentation.

Students should avoid submitting multiple disconnected PDF files. All documentation must be combined into one coherent publication.

Drawing and Document Organisation

Although individual sheets may use different paper sizes and orientations where appropriate, the final PDF must maintain a consistent and deliberate approach to document organisation.

Particular attention should be given to:

  • Consistent sheet naming and numbering.

  • Appropriate drawing scales and dimension strings.

  • Clear labelling of drawings, schedules and photographs.

  • Consistent graphical presentation and annotation.

  • Logical sequencing of the documentation.

  • Clear identification of all submitted files and associated links.

The objective is to produce a professional documentation package that can be understood and navigated by someone unfamiliar with the project.


3. Information Management Standards and Model Quality

An important part of the discussion concerned the relationship between information management standards and the quality of the BIM deliverable.

Students were reminded that BIM is not simply a modelling exercise. It involves the structured production, management, exchange and verification of information throughout a project.

Three international standards were highlighted:

ISO 19650 – Information Management Using Building Information Modelling

ISO 19650 provides a framework for managing information throughout the lifecycle of a built asset. Its principles are particularly relevant to collaborative working environments, where multiple contributors must produce and exchange information in a coordinated manner.

ISO 9001 – Quality Management Systems

ISO 9001 establishes principles for quality management, including consistency, process control, verification and continuous improvement. These principles are relevant to the way students organise their modelling and documentation workflows, ensuring that the final deliverables meet defined expectations.

ISO 7817 – Level of Information Need

The discussion also introduced the importance of defining the appropriate level of information required for different elements of a model. Students should understand that the amount of information included in a model must be appropriate to its intended purpose and the requirements of the project.

The key takeaway is that a successful BIM deliverable must balance graphical representation, geometric accuracy and the information associated with each element.


4. Measured Information vs Assumptions: Representing Uncertainty in BIM

One of the more important discussions concerned how students should represent existing building conditions, particularly where buildings are dilapidated, inaccessible or difficult to survey accurately.

Using the example of Lillian's building, the discussion highlighted the distinction between information that has been directly measured and verified and information that has been assumed or inferred.

This distinction is particularly important when working with existing buildings. Not every element can necessarily be measured or inspected, and students must avoid presenting assumptions as though they were verified survey information.

For example, an existing wall may be partially obscured or deteriorated, making it difficult to establish its exact construction or dimensions. Rather than modelling an assumed condition as a confirmed fact, students should communicate the uncertainty through an appropriate graphical approach.

Developing a Visual Language for Uncertainty

Students were encouraged to establish a clear and consistent visual language within their models and drawings to distinguish between:

  • Measured and verified information: Elements and dimensions directly established through the survey process.

  • Assumed information: Elements modelled using reasonable assumptions where direct measurement or verification was not possible.

  • Inferred or interpreted information: Conditions derived from available evidence, surrounding geometry, photographs or other contextual information.

The purpose is not necessarily to avoid making assumptions. In many existing-building projects, assumptions are unavoidable. Instead, the objective is to ensure that the reliability and origin of information remain transparent.

This is an important aspect of information management and quality assurance. A model should communicate not only what is believed to exist, but also how confidently that information has been established.


5. BIM Tracker – Individual Contributions and Assessment

The class was reminded that the BIM Tracker assignment tool will be used to monitor and establish traceability of individual contributions to the collaborative project.

Although Assignment 2 is a group exercise, individual participation and contributions remain important considerations in the assessment process.

Students should ensure that their activities and contributions are properly recorded through the BIM Tracker. This will provide a means of identifying individual involvement within the wider collaborative workflow and support the allocation of individual grades.

The intention is to ensure that assessment reflects both the quality of the collective deliverable and the contributions made by individual group members.


6. Assignment 3 – Studio and Mimic Exercise

Towards the end of the session, Assignment 3 was briefly introduced.

Unlike Assignment 2, which focuses on collaborative BIM production and documentation, Assignment 3 will be studio-based and will require students to apply graphical techniques explored during the Mimic exercise.

Students will be required to replicate two specific graphical techniques from their Mimic work and incorporate them into two elements of their architectural studio presentation boards.

The emphasis will be on demonstrating an understanding of the selected graphical techniques and applying them appropriately within the context of architectural presentation.

Further discussion and clarification of Assignment 3 will take place during the final class session.


7. Outstanding Submissions and Class Administration

Students were reminded that Assignment 1 still had 18 outstanding submissions at the time of the meeting.

Most groups had already submitted their field notes and collaboration workflow proposals for Assignment 2. However, any students or groups with outstanding documentation were encouraged to ensure that these were completed.

The final class session will focus exclusively on Assignment 3, allowing students to clarify any remaining questions before completing their submissions.


Key Dates and Submission Checklist

ASSIGNMENT 2 – MAJOR COLLABORATIVE BIM PROJECT

18 December

Final submission deadline

Required deliverables

  • Completed Revit model.

  • One consolidated PDF containing all drawings, schedules, photographs and supporting documentation.

  • Consistent naming, labelling and document organisation.

  • Clear graphical distinction between measured, assumed and inferred information.

  • BIM Tracker records documenting individual contributions.

    ASSIGNMENT 3 – STUDIO / MIMIC


    18 December

    Required deliverables

    • Replication of two graphical techniques explored in Mimic.

    • Application of these techniques to two elements of the architectural studio presentation boards.

    Outstanding work

  • Students who have not submitted Assignment 1 must complete and submit it.

  • Groups should ensure that their field notes and collaboration workflow proposals have been submitted.

Final Remarks

The central message of this session was that the quality of a BIM project extends beyond the appearance of the model. A successful submission must demonstrate a structured approach to information management, reliable documentation practices, coordinated collaboration and an understanding of the limitations of surveyed information.

Students should approach their final deliverables as professional information packages rather than simply collections of drawings and model files. The ability to communicate what is known, what has been assumed and how information has been organised is an essential part of professional BIM practice.

Please ensure that all outstanding submissions are addressed and that your groups are working towards the 18 December final submission deadline.